Foreman Roberts were the lead consultant for resilience Improvement Projects. Upgrade of existing operational Data Centre. Works included feasibility study to identify all available options for IBM followed by detailed design and project implementation. Upgrade of existing infrastructure within fully operational 100,000ft2 data centre, including feasibility study and detailed load analysis, to determine optimum solution for upgrade to critical systems infrastructure. Solution provides improved load management within data centre and reduced single points of failure.